What we do
HVAC, electrical and building-envelope services
15+ services across 200+ cities in 7 counties. HVAC, electrical, roofing and insulation planned together instead of sold separately.
HVAC
Heating and cooling, sized by load calculation rather than by whatever was there before.
- HVAC ReplacementThe most expensive mistake in HVAC replacement is matching the tonnage of the old system. If the old system was wrong, and in older homes it usually was, you have just paid to install the same problem in a newer box.Read more about hvac replace →
- Heat Pump InstallationIn most Southern California climate zones a modern heat pump carries the heating load comfortably and does it far more efficiently than a gas furnace. The interesting questions are electrical capacity and duct condition, not whether the technology works.Read more about heat pumps →
- Commercial & Industrial HVACA rooftop unit that fails in August does not just cost the replacement. It costs whatever the building was doing that day, and for most commercial buildings that number is larger than the equipment.Read more about commercial hvac →
- Multi-Family HVACMulti-family HVAC is a scheduling problem wearing a mechanical disguise. The equipment is straightforward; getting through forty occupied units without forty angry residents is the actual job.Read more about multi-family →
- HVAC Maintenance & Service AgreementsMaintenance is unglamorous and it is the highest-return money in the whole category. A dirty condenser coil can add a double-digit percentage to what a system draws, and it costs almost nothing to clean.Read more about maintenance →
- HVAC RepairMost air conditioning failures happen in the first genuinely hot week of the year, when the system runs continuously for the first time in months and a marginal component finally gives up.Read more about repair →
Electrical
Panel capacity, rewiring and distribution, the infrastructure every other upgrade depends on.
- Electrical Panel UpgradesThe panel is the bottleneck through which every other upgrade must pass. Heat pump, EV charger, induction range, ADU, each is an electrical load, and a 100-amp service built for a 1965 house was not sized for any of them.Read more about panel upgrades →
- Whole-Home RewiringMost of the housing stock we work in predates 1980, and a meaningful share of it is running on wiring that was marginal when it was new. Rewiring is invisible when finished and it is the upgrade your insurer, your inspector and your panel all care about.Read more about rewiring →
- Commercial & Industrial ElectricalCommercial electrical work is judged on two things: whether the building kept operating while you did it, and whether the as-builts match reality when the next contractor opens the panel.Read more about commercial electrical →
- EV Charger InstallationThe charger is the cheap part. Whether your electrical service can carry a 40 to 60 amp continuous load is the question that decides what this actually costs.Read more about ev chargers →
- New Construction ElectricalOn a construction schedule, the electrician is judged on exactly two dates: rough-in and final. Hit both, pass both inspections first time, and the rest is craft.Read more about new construction →
Building Envelope (Insulation & Roofing)
The outer “skin” of your home that keeps energy from leaking out — roofing, insulation and the efficiency work that decides how hard the HVAC has to work.
- Roof ReplacementA roof is an energy component as much as a weather barrier. Surface color and assembly change attic temperature substantially, which changes the cooling load of everything underneath it.Read more about roofing →
- InsulationInsulation is the least visible thing we install and usually the one with the largest measurable effect on a bill. It is also what should happen before anyone sizes a new air conditioner, not after.Read more about insulation →
- Energy-Efficiency UpgradesEfficiency measures compound when sequenced correctly and merely coexist when bought separately. The envelope shrinks the load, the right-sized equipment serves the smaller load, and the electrical capacity freed up funds the electrification. That ordering is the product.Read more about energy upgrades →
- Exterior PaintingAn exterior paint job is ninety percent preparation. The coating is the part everyone shops on and the part that matters least to how long it lasts.Read more about painting →
Not sure where to start?
Call (818) 915-1604. Describe your bill and your comfort problems and we will tell you what to fix first.
